Reficar Refinery Expansion – Pipe Rack Access Platforms & Stair Towers

Cartagena, Colombia

Reficar Refinery Expansion – Pipe Rack Access Platforms & Stair Towers

Cartagena, Colombia

Work: Refinery Expansion

How:
Engineered and installed multi-level Ringlock scaffolding, suspended access platforms, and modular stair towers to provide safe access for structural steel erection, piping installation, mechanical works, and inspections throughout the refinery expansion.

Why:
Delivered safe, efficient, and OSHA-compliant access solutions that supported multiple trades simultaneously, improving productivity while maintaining the highest safety standards on one of Latin America’s largest refinery expansion projects.

  Hotel Flor Tampa Downtown, Tapestry Collection by Hilton

Water Tank Construction

Covington, Kentucky

Water Tank Construction

Covington, Kentucky

Work: Water Tank Construction

Description: When structural loads increase, so does the need for absolute reliability.

This water tank construction project in Covington, Kentucky required a shoring solution capable of handling significant vertical demands without compromising stability at any stage of the build.

AAIT provided 10K shoring frames designed for high-capacity applications. Even with the distance from our primary yards, our ability to deliver quality equipment and coordinate logistics effectively ensured the contractor had consistent access to the materials required. Strong relationships and dependable execution supported steady progress across the entire project.

  Hotel Flor Tampa Downtown, Tapestry Collection by Hilton

Hotel Flor Tampa Downtown, Tapestry Collection by Hilton

Tampa, Florida

Hotel Flor Tampa Downtown, Tapestry Collection by Hilton

Tampa, Florida

Work: Renovation

Description: Renovating an active structure is never just about access—it’s about adapting in real time.

Located in Tampa, Florida, this project required a solution that could respond to constant changes in layout and workflow. Working within an existing building meant access points and conditions evolved as the project progressed.

AAIT supported the project with the Ringlock system, providing the flexibility needed to adjust quickly while maintaining safety and efficiency. With our Miami Yard in close proximity, we ensured fast mobilization and a steady flow of material throughout each phase. Established relationships with the project team also played a key role in keeping coordination smooth from start to finish.

  Hotel Flor Tampa Downtown, Tapestry Collection by Hilton

Francis Key Scott Bridge

Maryland

Francis Key Scott Bridge

Maryland

Work: Complete upgrade to new standards

Description: Infrastructure projects leave little room for delays—and even less for inconsistency.

This bridge upgrade in Maryland required a solution capable of supporting multiple trades working simultaneously, each with different access needs across the structure.

AAIT provided access systems designed to serve all trades on site, ensuring that crews could operate safely and efficiently without interfering with one another. As the project progressed, these systems were adapted to meet changing conditions and maintain continuous workflow across work zones.

Availability and competitive pricing were key factors in the selection process, and our ability to meet both, while delivering reliable, multi-trade access, made us a strong fit for this public infrastructure project.

  Hotel Flor Tampa Downtown, Tapestry Collection by Hilton

Choctaw Casino & Resort

Durant, Oklahoma

Choctaw Casino & Resort

Durant, Oklahoma

Work: Expansion and renovation

Description: Large-scale expansions demand systems that can keep up without slowing the job down.

The expansion and renovation of this casino project in Durant, Oklahoma required a solution capable of performing across multiple phases simultaneously, supporting both new construction and modifications to existing structures.

AAIT supplied the Ringlock system to provide the flexibility needed across different work areas, allowing crews to adapt as conditions evolved. More than proximity, the project relied on consistent coordination, reliable material availability, and a strong working relationship with the team to keep progress aligned across phases.

  Hotel Flor Tampa Downtown, Tapestry Collection by Hilton

Gaylord Rockies Resort & Convention

Aurora, Colorado

Gaylord Rockies Resort & Convention

Aurora, Colorado

Work: New construction

Description: On large-scale builds, speed and consistency define the pace of progress.

This new construction project in Aurora, Colorado required a system that could support efficient vertical development without adding complexity on site.

AAIT provided the Cuplock system, known for its fast assembly and reliability in repetitive structural applications. While not located near one of our primary yards, our ability to deliver quality equipment and maintain strong coordination ensured the project stayed on track. Trusted relationships and consistent execution supported progress from early stages through completion.

Reficar Refinery Expansion – Pipe Rack Access Platforms & Stair Towers

Hotel Flor Tampa Downtown, Tapestry Collection by Hilton

Water Tank Construction

Hotel Flor Tampa Downtown, Tapestry Collection by Hilton

Hotel Flor Tampa Downtown

Hotel Flor Tampa Downtown, Tapestry Collection by Hilton

Francis Key Scott Bridge

Hotel Flor Tampa Downtown, Tapestry Collection by Hilton

Choctaw Casino & Resort

Hotel Flor Tampa Downtown, Tapestry Collection by Hilton

Gaylord Rockies Resort & Convention

Need Scaffolding or Formwork for Your Next Project?

Get Fast Response, Reliable Supply, And The Support Your Project Needs.

REQUEST A QUOTE