Use | The screw jack is used as a starting base for a scaffold where the supporting surface of the scaffold is on a slope. |
Material |
High strength low alloy structural steel.
|
Finish | Zinc plated / Hot Dip Galvanized. |
Use | The screw jack is used as a starting base for a scaffold where the supporting surface of the scaffold is on a slope. |
Material |
High strength low alloy structural steel.
|
Finish | Zinc plated / Hot Dip Galvanized. |